TX 144

TX 144 is a 82.5 MW-DC solar farm being developed by Caret in Cottle County, TX.

The project has a 20-year land lease with four 5-year extension options, completed environmental studies, and is on track to complete interconnection studies in 2022.

82.5 MW-DC / 60.0 MW-AC

Project Size

161,400 MWh/year

Production

ERCOT

ISO

AEP

Utility

440

Acres

2022

Target COD