TX 195

TX 195 is a 41.3 MW-DC solar farm being developed by Caret in Medina County, TX.

The project has a 20-year land lease with four 5-year extension options, completed environmental studies, and is on track to complete interconnection studies in 2022.

41.3 MW-DC / 30.0 MW-AC

Project Size

76,900 MWh/year

Production

ERCOT

ISO

CPS Energy

Utility

233

Acres

2024

Target COD