TX 307

TX 307 is a 55.1 MW-DC solar farm being developed by Caret in Potter County, TX.

The project has a 20-year land lease with four 5-year extension options, completed environmental studies, and is on track to complete interconnection studies in 2022.

55.1 MW-DC / 40.0 MW-AC

Project Size

108,600 MWh/year

Production

SPP

ISO

Xcel Energy

Utility

288

Acres

2024

Target COD